El Dorado Irrigation District
El Dorado County, including Cameron Park and Placerville-area service territory
Population reference
132,171
Billing detail
Partial public detail found
Official destination
Open provider website ↗Provider-specific findings
Billing and account research from public material
Provider-specific research notes are displayed separately from fields that contain only an unavailable-information marker. Read qualifiers in each note and verify current account terms with the provider.
- Billing frequency
- Bi-monthly rate schedule; EID’s 2026 rate table is explicitly adopted as a bi-monthly schedule effective January 1, 2026.
- Rate structure
- EID’s 2026 rate tables separate water, wastewater, and recycled-water base and commodity charges by customer class and meter/service type. 2026 wastewater examples include single-family residential flat rate $70.38 plus $0.050003 per cubic foot, while a District-average residential total is $150.38; services outside the District are billed at 1.5 times adopted rates.
- Wastewater and sewer calculation
- EID publishes wastewater base and commodity charges separately by residential, multifamily, and commercial class. The 2026 single-family residential wastewater commodity rate is $0.050003 per cubic foot and the flat residential base is $70.38; the District-average residential figure of $150.38 includes the published average-use calculation.
- Meter reading
- EID’s 2026 rate schedule is bi-monthly. The reviewed public pages do not identify AMI/AMR technology or a specific read-transmission interval.
Context, not a score
How documentation coverage compares
This profile
57%
overview fields with research notes
California
67%
records with any overview detail
National index
50%
records with any overview detail
Coverage measures what this directory documented. It does not measure service quality, affordability, or regulatory compliance.
Research record
Partial public detail found
4 of 7 fields in this section contain provider-specific public detail in dataset August 1, 2026.
Documented
57%
Details not confirmed in the reviewed public material
- Residential cost reference
- New-account deposit
- Activation or transfer fee
“Not confirmed” means the directory did not identify a dependable public statement. It does not mean the provider has no policy or option.
Primary verification routes
- El Dorado Irrigation District public website ↗
Provider-controlled destination used to confirm current customer instructions.
- EPA Safe Drinking Water Information System ↗
Federal background on public water-system records and their limitations.
