Delinquency research · dataset 2026.08
Shut-off and delinquency information for City of Boulder Utility Billing - Water, Wastewater and Flood/Stormwater
Only provider-specific public findings are stated as policy. A missing field is not replaced with a rule borrowed from another utility.
Provider-specific findings
Delinquency research for this provider
The notes below may document a rule or explain a specific public-information limit. Any active notice and direct provider confirmation remain controlling.
- Grace period
- 10 days after receiving a utility bill; Boulder states all payments are due within ten days.
- Warning and notice protocol
- The 2026 fee inventory lists a $30.45 water-service termination-notice fee, but the reviewed customer page does not specify whether the notice is mailed, automated, texted, or delivered by door hanger.
- Reconnection costs
- 2026 fee inventory lists $60.90 to resume water service and $134.40 to resume service after 3:00 p.m. or on weekends/holidays. The City also lists a $30.45 termination-notice fee; these are separate from the outstanding balance.
Documentation context
3 of 5 fields found
This is a record-completeness measure, not a customer-protection grade.
Colorado
38%
records with any shut-off detail
National
34%
records with any shut-off detail
Research record
Partial public detail found
3 of 5 fields in this section contain provider-specific public detail in dataset August 1, 2026.
Documented
60%
Details not confirmed in the reviewed public material
- Late-fee rules
- Shut-off timeline
“Not confirmed” means the directory did not identify a dependable public statement. It does not mean the provider has no policy or option.
Primary verification routes
- City of Boulder Utility Billing - Water, Wastewater and Flood/Stormwater public website ↗
Provider-controlled destination used to confirm current customer instructions.
- EPA SDWIS / ECHO lookup (CO0107152) ↗
Search the federal drinking-water database using public water system ID CO0107152.
