Notice and timing
How delinquency is handled
Grace period after the due date
A dedicated this detail was not publicly posted. For a water-specific 2026 grace period. The current FAQ says the due date is printed on the bill and that failure to pay may result in disconnection. A separate city past-due page describes a 20-day reminder and a 27-day pink-tag/$12 fee sequence, but its 37-day shutoff language is expressly written for electric power rather than water and is not treated here as a verified water timeline.
Late-fee calculation
The current Longmont utility FAQ states that a disconnected account must pay the full past-due balance plus applicable collection fees before restoration. The city’s separate past-due schedule identifies a $12 fee when the 27-days-past-due pink tag is printed/mailed, but the page frames the final 37-day termination step as electric power shutoff. A current water-account late-fee percentage or fixed delinquency charge was not separately published on the reviewed water-billing pages; customers should obtain the exact account charge from Utility Billing at (303) 651-8664.
Disconnection timeline
No water-specific calendar was verified in the current public pages. The current FAQ confirms that nonpayment can disconnect service and that full past-due charges plus collection fees are required after disconnection. Longmont’s separate past-due page states 20 days after the due date for a reminder, 27 days for a pink tag and $12 fee, and 37 days for electric power shutoff; because that final sequence is labeled electric, it should not be presented as the confirmed water-service schedule.