Independent directory · evidence, sources, and research gaps shown
US Water Bill PayIndependent U.S. utility directory
← Florida utility index
Public Water AuthorityDataset 2026.08PWS ID FL2554447

St. Johns County Utility Department - CR214 Mainland Water Treatment Plant System (SJCUD)

St. Augustine, St. Augustine South and Vilano Beach served by the St. Johns County CR214 Mainland system

Population reference

66,953 people (EPA SDWA queue estimate for FL2554447; the 2025 CCR identifies CR214 Mainland and Northwest Utilities plants serving the system)

Billing detail

Broad public detail found

Official destination

Open provider website ↗

Provider-specific findings

Billing and account research from public material

Provider-specific research notes are displayed separately from fields that contain only an unavailable-information marker. Read qualifiers in each note and verify current account terms with the provider.

Billing frequency
Monthly; payments are due monthly.
Rate structure
Metered County water service under the Fiscal Year 2026 St. Johns County Water, Wastewater and Reclaimed Water System Rate Tariff, effective May 1, 2026. The reviewed public tariff was not reproduced in full here, so the exact residential base and tier figures remain linked to the official rate sheet.
Wastewater and sewer calculation
SJCUD provides drinking water and wastewater services under the same County utility tariff; the reviewed public pages do not state the exact CR214 residential sewer formula, winter averaging method or cap.
Meter reading
SJCUD's Sensus Analytics Customer Portal provides hour-by-hour consumption statistics, weather comparisons and email/text usage alerts. The reviewed pages do not state the exact physical AMI/AMR vendor deployment or fixed field-reading schedule beyond the portal's hourly data.
New-account deposit
A deposit is due when new water/sewer service is established under County Ordinance 2022-37; the required amount is address/account dependent and must be obtained from Customer Service. The first bill also includes a $30.00 new-service charge. The reviewed pages do not state a credit-check waiver or refund schedule.
Activation or transfer fee
A $30.00 new-service charge is added to the first month's bill. New water/sewer accounts established before noon are turned on the same day; the reviewed pages do not expose a separate universal transfer fee.

Context, not a score

How documentation coverage compares

This profile

86%

overview fields with research notes

Florida

60%

records with any overview detail

National index

50%

records with any overview detail

Coverage measures what this directory documented. It does not measure service quality, affordability, or regulatory compliance.

Research record

Broad public detail found

6 of 7 fields in this section contain provider-specific public detail in dataset August 1, 2026.

Documented

86%

Details not confirmed in the reviewed public material

  • Residential cost reference

“Not confirmed” means the directory did not identify a dependable public statement. It does not mean the provider has no policy or option.

Primary verification routes