Delinquency research · dataset 2026.08
Shut-off and delinquency information for Pennsylvania-American Water Company
Only provider-specific public findings are stated as policy. A missing field is not replaced with a rule borrowed from another utility.
Provider-specific findings
Delinquency research for this provider
The notes below may document a rule or explain a specific public-information limit. Any active notice and direct provider confirmation remain controlling.
- Grace period
- The bill’s due date must be at least 20 days after transmittal. A payment received more than five days after the due date is subject to the late-payment penalty, so the ordinary penalty trigger is due date plus five days; termination and notice protections follow Pennsylvania PUC rules and the company tariff.
- Late-fee rules
- The current water tariff adds a 1.50% penalty to the overdue portion of the bill when payment is more than five days late, calculated monthly thereafter and capped at 18% annually. The current miscellaneous-fee schedule charges $20 for each returned check or automatic transfer, in addition to any bank charge. Wastewater uses the same 20-day payment timing and a late charge not exceeding 1.50% per billing period and 18% annually. Residential customers should contact the company before the due date for an installment or payment arrangement.
- Shut-off timeline
- The tariff says service may be terminated for an unpaid bill, but Pennsylvania’s Chapter 14 consumer-protection rules govern the practical notice and termination progression rather than a single public calendar of due date plus a fixed number of days. A customer has at least 20 days to pay, receives termination notices and payment-arrangement opportunities, and may dispute a bill while the investigation is pending. At the attempted shutoff, the utility must try to contact a responsible adult; if none is home, it leaves notice that it will return in 48 hours. Winter, medical, low-income, and domestic-violence protections can postpone termination.
- Warning and notice protocol
- Pennsylvania American Water allows customers to designate a consenting third party to receive duplicate reminder, past-due, delinquent-account, and termination notices through a signed third-party notification form. The company’s rights material explains that a termination attempt requires contact with a responsible adult at the residence when possible; if no adult is home, a notice is left stating that the company will return in 48 hours. Customers can request payment arrangements, medical certification, protection-from-abuse protections, and PUC review; the company does not publish a universal colored-paper, text-keyword, or automated-call sequence for every rate zone.
- Reconnection costs
- The January 13, 2026 water miscellaneous-fee schedule lists a $30 service activation/turn-on fee and a $30 turn-on fee after service discontinuance or for service reconnection. The wastewater tariff likewise charges the greater of $30 or actual cost during regular hours; during non-regular hours the fee equals the company’s incurred cost, including overtime or holiday expense. A customer must pay the turn-on fee, outstanding balance, and any extraordinary termination expense before restoration; the same reconnection fee applies only once when the customer has both company water and wastewater service.
Documentation context
5 of 5 fields found
This is a record-completeness measure, not a customer-protection grade.
Pennsylvania
25%
records with any shut-off detail
National
34%
records with any shut-off detail
Research record
Broad public detail found
5 of 5 fields in this section contain provider-specific public detail in dataset August 1, 2026.
Documented
100%
Primary verification routes
- Pennsylvania-American Water Company public website ↗
Provider-controlled destination used to confirm current customer instructions.
- dollarenergy.org reference ↗
Public URL preserved in the compiled record. Confirm its publisher, date, and applicability before relying on it.
- EPA Safe Drinking Water Information System ↗
Federal background on public water-system records and their limitations.
