Independent directory · evidence, sources, and research gaps shown
US Water Bill PayIndependent U.S. utility directory
← Texas utility index
Municipal DepartmentDataset 2026.08

City of Athens Utility Billing Department

Athens municipal water and wastewater service area in Henderson County

Population reference

Approximately 14,000 municipal residents; the current City utility pages do not expose a separate regulated PWS population figure.

Billing detail

Broad public detail found

Official destination

Open provider website ↗

Provider-specific findings

Billing and account research from public material

Provider-specific research notes are displayed separately from fields that contain only an unavailable-information marker. Read qualifiers in each note and verify current account terms with the provider.

Billing frequency
Recurring municipal billing; the current indexed page does not state a universal billing day or cycle frequency.
Rate structure
FY2026 rates use a 3/4-inch base rate of $20.80 including 2,000 gallons and a volumetric charge of $4.35 per 1,000 gallons above the included amount. Larger meter base rates are separately scheduled.
Residential cost reference
At 6,000 gallons, water is approximately $38.20 using the FY2026 3/4-inch base ($20.80 plus four $4.35 units above 2,000), before sewer and other services. The current indexed materials do not expose the complete sewer calculation for a combined estimate.
Wastewater and sewer calculation
FY2026 wastewater has a $27.00 base including 2,000 gallons and an $8.66 per 1,000-gallon volumetric rate from 2,000–7,000 gallons, with a separate commercial rate above the residential maximum. At 6,000 gallons the residential sewer component is approximately $61.64.
Meter reading
The reviewed current City pages do not identify AMR/AMI hardware, vendor, transmission interval, or route calendar. Exact meter technology and schedule are not publicly documented.
New-account deposit
FY2026 customer deposit is $100 residential, $150 commercial, and $1,000 for a commercial fire-hydrant meter; deposits are refundable and payable at the service date. A separate service connection fee is $50.
Activation or transfer fee
The FY2026 schedule lists a $50 normal service connection fee and $50 transfer fee for moving existing service to a new address. Reconnection after nonpayment is separately priced.

Context, not a score

How documentation coverage compares

This profile

100%

overview fields with research notes

Texas

68%

records with any overview detail

National index

50%

records with any overview detail

Coverage measures what this directory documented. It does not measure service quality, affordability, or regulatory compliance.

Research record

Broad public detail found

7 of 7 fields in this section contain provider-specific public detail in dataset August 1, 2026.

Documented

100%

Primary verification routes