Independent directory · evidence, sources, and research gaps shown
US Water Bill PayIndependent U.S. utility directory
← Utility research profile

Delinquency research · dataset 2026.08

Shut-off and delinquency information for City of McKinney Utility Billing

Only provider-specific public findings are stated as policy. A missing field is not replaced with a rule borrowed from another utility.

Provider-specific findings

Delinquency research for this provider

The notes below may document a rule or explain a specific public-information limit. Any active notice and direct provider confirmation remain controlling.

Grace period
Five days after the due date before the late fee is added; a separate 19-day automatic extension period is then described from the due date.
Late-fee rules
A 10 percent late fee is added to current charges after the five-day grace period, with a minimum of $5.00. Payment extensions can avoid the fee if payment is received during the 19-day automatic extension; additional payment plans generally require eligibility and 50 percent payment.
Shut-off timeline
The bill is due 16 days after the bill date, then has a five-day late-fee grace period and a 19-day automatic extension. If service is disconnected, the customer must pay the entire past-due balance, current bill, and related fees; an additional deposit is required if disconnected twice within 12 months and for each later disconnection.
Warning and notice protocol
The reviewed McKinney page publishes the grace and extension rules but does not expose a complete phone, text, mail, door-hanger, and final-field-notice cadence.

Documentation context

4 of 5 fields found

This is a record-completeness measure, not a customer-protection grade.

Texas

53%

records with any shut-off detail

National

34%

records with any shut-off detail

See the nationwide customer-protection analysis →

Research record

Broad public detail found

4 of 5 fields in this section contain provider-specific public detail in dataset August 1, 2026.

Documented

80%

Details not confirmed in the reviewed public material

  • Reconnection costs

“Not confirmed” means the directory did not identify a dependable public statement. It does not mean the provider has no policy or option.

Primary verification routes