Independent directory · evidence, sources, and research gaps shown
US Water Bill PayIndependent U.S. utility directory
← Texas utility index
Municipal DepartmentDataset 2026.08PWS ID TX0310002

Harlingen Waterworks System

Harlingen

Population reference

Approximately 72,000 residents in Harlingen and the surrounding HWWS service area; the system identifies public water system TX0310002 and operates the City water and wastewater network.

Billing detail

Broad public detail found

Official destination

Open provider website ↗

Provider-specific findings

Billing and account research from public material

Provider-specific research notes are displayed separately from fields that contain only an unavailable-information marker. Read qualifiers in each note and verify current account terms with the provider.

Billing frequency
Monthly; HWWS offers monthly electronic billing and monthly ACH bank draft.
Rate structure
The system uses adopted residential and commercial water and wastewater schedules with fixed charges plus volumetric consumption rates. HWWS approved a planned series of rate increases and states that the next scheduled increase is proposed for October 1, 2026; the accessible rate page does not render the complete table in text.
Wastewater and sewer calculation
HWWS publishes separate wastewater rates for residential and commercial customers. The accessible page confirms that the charge is based on the adopted rate schedule, but it does not expose the complete winter-average, monthly-consumption, or cap formula in text.
Meter reading
HWWS provides a public 'How to Read Your Meter' resource and bills monthly, but the reviewed pages do not identify the meter vendor, AMI/AMR communications technology, hourly transmission interval, or exact route schedule.
New-account deposit
Residential and commercial deposits start at $150.00. Residential applicants must present government ID, a matching Social Security card/passport/birth certificate, and a signed rental or purchase agreement; the security deposit plus service fee must be paid before release of the connection. Commercial deposits can be reduced by approximately 50% with a personal guaranty from a responsible owner or officer.
Activation or transfer fee
A next-day connection service fee is $15 and a same-day connection fee is $25. New connections are performed between 1:00 p.m. and 8:00 p.m.; the first bill must be paid in person or through the drive-through. Transfer-specific fees are not separately stated.

Context, not a score

How documentation coverage compares

This profile

86%

overview fields with research notes

Texas

68%

records with any overview detail

National index

50%

records with any overview detail

Coverage measures what this directory documented. It does not measure service quality, affordability, or regulatory compliance.

Research record

Broad public detail found

6 of 7 fields in this section contain provider-specific public detail in dataset August 1, 2026.

Documented

86%

Details not confirmed in the reviewed public material

  • Residential cost reference

“Not confirmed” means the directory did not identify a dependable public statement. It does not mean the provider has no policy or option.

Primary verification routes