Independent directory · evidence, sources, and research gaps shown
US Water Bill PayIndependent U.S. utility directory
← Utility research profile

Delinquency research · dataset 2026.08

Shut-off and delinquency information for Wells Branch Municipal Utility District

Only provider-specific public findings are stated as policy. A missing field is not replaced with a rule borrowed from another utility.

Provider-specific findings

Delinquency research for this provider

The notes below may document a rule or explain a specific public-information limit. Any active notice and direct provider confirmation remain controlling.

Grace period
Bills are past due after the 20th; if the 20th falls on a weekend or holiday, the past-due date moves to the next business day. A termination letter is sent if payment is not made within six days after the past-due date.
Late-fee rules
Payments received after the 20th are assessed a 10% late fee. The district may waive a late fee when a customer did not receive a bill, but a payment sent late is automatically assessed and cannot be waived under the published FAQ.
Shut-off timeline
After the bill becomes past due, the district allows six days before sending a termination letter that states the amount due and termination date. If payment is not received by 5:00 p.m. on that termination date, water service is terminated. Restoration requires all delinquent and current charges, a $35 administrative fee, and an additional $100 deposit up to a $600 maximum; a $150 meter reinstallation fee applies if the meter was removed.
Warning and notice protocol
Wells Branch sends a termination letter after six days of nonpayment and allows optional additional email notifications through the online account. For boil-water notices, Crossroads representatives visit homes and leave a door hanger when no one is home; that door-hanger practice is a water-quality notice protocol, not a guaranteed delinquency notice.
Reconnection costs
$35 administrative fee plus a $100 additional deposit, subject to a $600 maximum total deposit, after termination whether or not the service was physically terminated. Reconnection requests after 2:00 p.m. incur an additional $65 after-hours fee. If the meter was removed, add $150 for reinstallation.

Documentation context

5 of 5 fields found

This is a record-completeness measure, not a customer-protection grade.

Texas

53%

records with any shut-off detail

National

34%

records with any shut-off detail

See the nationwide customer-protection analysis →

Research record

Broad public detail found

5 of 5 fields in this section contain provider-specific public detail in dataset August 1, 2026.

Documented

100%

Primary verification routes