Provider-specific review
What the public record says about a leak adjustment
Palm Coast offers one partial leak credit in a rolling 24-month period, affecting no more than two billing months. The first affected bill must be at least four times the customer’s prior 12-month average, and the request must be submitted within 90 days of that bill date. A plumber receipt, parts receipt, repair quote, or other specific repair documentation is required; photos may supplement the record. New landscaping, guest visits, pool repairs, sprinkler malfunctions, and leaving a hose on are excluded. If approved, abnormal water consumption is reduced to the lowest tier, but the gallons billed are not erased; sewer is not adjusted when the water entered the sewer. If documented evidence shows the leak did not enter the sewer, the City may credit sewer back to the average. A sprinkler leak on the main house meter receives only a sewer credit. The customer must continue paying the bill while the request is reviewed, and payment is still required to prevent shutoff and added fees.
Stop the loss
Shut off the failing fixture or supply and arrange a qualified repair.
Keep proof
Save dated invoices, parts receipts, photographs, and meter readings.
Request review
Submit the request promptly and keep paying any undisputed amount.