Independent directory · evidence, sources, and research gaps shown
US Water Bill PayIndependent U.S. utility directory
← Texas utility index
Public Water AuthorityDataset 2026.08

Fern Bluff Municipal Utility District

Fern Bluff, Round Rock

Population reference

Not identified in this release

Billing detail

Partial public detail found

Official destination

Open provider website ↗

Provider-specific findings

Billing and account research from public material

Provider-specific research notes are displayed separately from fields that contain only an unavailable-information marker. Read qualifiers in each note and verify current account terms with the provider.

Billing frequency
Monthly.
Rate structure
Base charge plus increasing-block water rates: $21.00 base, $3.60 per 1,000 gallons from 1,000-15,000, and $4.00 above 15,000, plus a mandatory 0.05% TCEQ fee. Wastewater has a $7.75 base and $3.40 per 1,000 gallons.
Residential cost reference
Approximately $71.40 for 5,000 gallons of water and sewer before garbage and stormwater: $21.00 water base + $18.00 water volume + $7.75 sewer base + $17.00 sewer volume. The page also lists $24.50 garbage and $0.65 stormwater, making the combined service total approximately $96.55 before the TCEQ fee.
Wastewater and sewer calculation
Sewer is based on the lower of winter-average use from the preceding mid-November through mid-February period or current monthly water use. New residents use the lower of actual current use or 8,000 gallons until an average is established; pool and winter-leak adjustments may be requested with documentation.

Context, not a score

How documentation coverage compares

This profile

57%

overview fields with research notes

Texas

68%

records with any overview detail

National index

50%

records with any overview detail

Coverage measures what this directory documented. It does not measure service quality, affordability, or regulatory compliance.

Research record

Partial public detail found

4 of 7 fields in this section contain provider-specific public detail in dataset August 1, 2026.

Documented

57%

Details not confirmed in the reviewed public material

  • Meter reading
  • New-account deposit
  • Activation or transfer fee

“Not confirmed” means the directory did not identify a dependable public statement. It does not mean the provider has no policy or option.

Primary verification routes