Independent directory · evidence, sources, and research gaps shown
US Water Bill PayIndependent U.S. utility directory
← Texas utility index
Public Water AuthorityDataset 2026.08

Jonah Water Special Utility District

Hutto, Georgetown, Weir, and surrounding Williamson County service area

Population reference

Not identified in this release

Billing detail

Broad public detail found

Official destination

Open provider website ↗

Provider-specific findings

Billing and account research from public material

Provider-specific research notes are displayed separately from fields that contain only an unavailable-information marker. Read qualifiers in each note and verify current account terms with the provider.

Billing frequency
Monthly; bills are mailed on or about the 20th and are due by 6:00 p.m. on the 15th of the following month, with the next open business day applying when the 15th is a weekend or holiday.
Rate structure
Increasing block water tiers with a meter-size base charge. Effective February 10, 2026, the standard residential 5/8- and 3/4-inch base is $39.53; volumetric tiers are $3.76 per 1,000 gallons for 1-15,000 gallons, $5.60 for 15,001-30,000, $7.45 for 30,001-50,000, and $9.27 above 50,000 gallons.
Residential cost reference
Jonah publishes a 2026 water-only billing example of $58.33 for 5,000 gallons. This is a direct current estimate for standard residential water service and excludes any separate wastewater charge, regulatory assessment treatment, or non-water service fees.
Wastewater and sewer calculation
Jonah's 2026 standard residential rate order lists no sewer gallonage charge for the standard water-only service schedule, and the published billing examples are explicitly water only. Customers whose property has a separate wastewater provider should not assume Jonah's water bill includes sewer; confirm service responsibility with the district.
Meter reading
Jonah states that its employees read all water meters monthly, generally at approximately the same time each month, and bills are calculated from reading date to reading date. The public material does not identify AMI/AMR equipment or remote transmission capability.
New-account deposit
Residential new service requires a $100 utility deposit and a $50 administrative fee. The deposit is held until the customer requests discontinuation; the final bill is deducted and any remaining balance is sent to the forwarding address. Builders also face a $500 construction deposit, refundable after required customer-service and cross-connection inspections when documentation is complete.
Activation or transfer fee
The published new-customer information lists a $50 administrative fee. A transfer within the district does not require an additional deposit unless the rate-order rules require one; physical meter or non-standard service costs can be separate.

Context, not a score

How documentation coverage compares

This profile

100%

overview fields with research notes

Texas

68%

records with any overview detail

National index

50%

records with any overview detail

Coverage measures what this directory documented. It does not measure service quality, affordability, or regulatory compliance.

Research record

Broad public detail found

7 of 7 fields in this section contain provider-specific public detail in dataset August 1, 2026.

Documented

100%

Primary verification routes