Independent directory · evidence, sources, and research gaps shown
US Water Bill PayIndependent U.S. utility directory
← Tennessee utility index
Public Water AuthorityDataset 2026.08

First Utility District of Knox County

West Knoxville and surrounding Knox County service area

Population reference

115,531

Billing detail

Broad public detail found

Official destination

Open provider website ↗

Provider-specific findings

Billing and account research from public material

Provider-specific research notes are displayed separately from fields that contain only an unavailable-information marker. Read qualifiers in each note and verify current account terms with the provider.

Billing frequency
Monthly; the district's rate schedule and customer portal describe monthly bills and monthly automatic deductions.
Rate structure
Increasing block tiers. The published schedule lists residential first 1,500 gallons at a $12.54 minimum, 1,501-8,000 gallons at $3.32 per 1,000 gallons, 8,001-20,000 at $4.12, and over 20,000 at $5.80. Seasonal/irrigation water has a separate minimum and no sewer charges.
Residential cost reference
Approximately $27.48 for 6,000 gallons using the published schedule ($12.54 minimum plus 4.5 thousand gallons at $3.32, subject to the district's billing-unit treatment and any current tariff update). Sewer, if applicable, is additional and has its own $22.86 minimum and $5.23-per-1,000-gallon structure.
Wastewater and sewer calculation
Residential sewer is billed from water usage: $22.86 minimum for the first 1,500 gallons, $5.23 per 1,000 gallons through 12,000 gallons, and no charge above 12,000 gallons, with a $77.78 monthly maximum. Sewer billing begins when a nearby sewer line is available under the district's connection rules, whether or not a customer has physically connected; seasonal/irrigation water is explicitly excluded from sewer charges.
New-account deposit
The online service application states that the district may require a cash deposit in an amount it deems adequate security for payment; the reviewed current pages do not publish a universal residential dollar amount or credit-check waiver/return schedule.
Activation or transfer fee
$35 connection fee when applying for service. An additional $30 same-day service fee applies when service is turned on after 3:30 p.m. on the sign-up day.

Context, not a score

How documentation coverage compares

This profile

86%

overview fields with research notes

Tennessee

43%

records with any overview detail

National index

50%

records with any overview detail

Coverage measures what this directory documented. It does not measure service quality, affordability, or regulatory compliance.

Research record

Broad public detail found

6 of 7 fields in this section contain provider-specific public detail in dataset August 1, 2026.

Documented

86%

Details not confirmed in the reviewed public material

  • Meter reading

“Not confirmed” means the directory did not identify a dependable public statement. It does not mean the provider has no policy or option.

Primary verification routes