Independent directory · evidence, sources, and research gaps shown
US Water Bill PayIndependent U.S. utility directory
← Texas utility index
Municipal DepartmentDataset 2026.08

City of Stephenville Water Department / Utility Billing

Stephenville municipal water and wastewater service area in Erath County

Population reference

Approximately 21,000 municipal residents; the City public pages do not expose a current PWS-specific population figure in the utility-billing text.

Billing detail

Broad public detail found

Official destination

Open provider website ↗

Provider-specific findings

Billing and account research from public material

Provider-specific research notes are displayed separately from fields that contain only an unavailable-information marker. Read qualifiers in each note and verify current account terms with the provider.

Billing frequency
Recurring municipal water billing; the current public page does not publish a universal billing day or exact cycle frequency beyond the recurring water-bill process.
Rate structure
City rate schedules establish metered water and wastewater charges, with separate inside/outside-city and customer classifications. The current FY2026 fee schedule is the controlling document; exact residential tier values are not exposed in the indexed billing page.
Wastewater and sewer calculation
Wastewater is billed under the City's water and sewer rate schedule and is based on metered utility service. The current indexed pages do not expose a complete sewer formula or winter-average method.
Meter reading
The current indexed billing page does not disclose AMR/AMI hardware, vendor, transmission interval, or meter-reading route calendar. Meter technology and schedule are not publicly documented pending a City specification.
New-account deposit
The City requires a residential water deposit of $150 in most cases. The deposit may be waived by a utility-company Letter of Credit showing at least one year of good standing during the current year; the letter must come directly from the utility company. The application also requires identity documentation and a signed agreement before connection.
Activation or transfer fee
The residential connection fee is $20. The City will not connect water until it receives the signed application, driver's license copy, and payment of the deposit and connection fee or an accepted Letter of Credit. A separate current transfer fee is not stated.

Context, not a score

How documentation coverage compares

This profile

86%

overview fields with research notes

Texas

68%

records with any overview detail

National index

50%

records with any overview detail

Coverage measures what this directory documented. It does not measure service quality, affordability, or regulatory compliance.

Research record

Broad public detail found

6 of 7 fields in this section contain provider-specific public detail in dataset August 1, 2026.

Documented

86%

Details not confirmed in the reviewed public material

  • Residential cost reference

“Not confirmed” means the directory did not identify a dependable public statement. It does not mean the provider has no policy or option.

Primary verification routes