Independent directory · evidence, sources, and research gaps shown
US Water Bill PayIndependent U.S. utility directory
← Texas utility index
Municipal DepartmentDataset 2026.08

College Station Utilities (CSU) Water and Wastewater / Utility Customer Service

City of College Station municipal water and wastewater service area

Population reference

The U.S. Census Bureau reports 128,023 residents in its July 1, 2024 estimate and 120,511 in the 2020 Census. College Station Utilities is a combined city-owned electric, water, wastewater, solid-waste, roadway, and drainage system; the municipal population is used as the conservative public service-area proxy.

Billing detail

Broad public detail found

Official destination

Open provider website ↗

Provider-specific findings

Billing and account research from public material

Provider-specific research notes are displayed separately from fields that contain only an unavailable-information marker. Read qualifiers in each note and verify current account terms with the provider.

Billing frequency
Monthly. College Station bills water in MGW, or thousands of gallons, using actual meter reads. The utility bill combines water and wastewater with other municipal services; customers may enroll in budget billing after at least 12 months at the same location, subject to the account being current and credit history review.
Rate structure
Increasing block conservation rates. The FY2026 adopted budget states that water and wastewater rates have no FY26 increase; the current City-published ordinance schedule uses a 3/4-inch residential water service charge of $12.40 per month and $2.75 per 1,000 gallons for 0-10,000 gallons, $3.60 for 11,000-15,000, $4.40 for 16,000-20,000, $5.20 for 21,000-25,000, and $6.05 above 25,000. Customers in Brazos County Municipal Utility District No. 1 pay the published rates with a 50% surcharge. Solid waste, roadway maintenance, and drainage are separate bill components.
Residential cost reference
Using the current published 3/4-inch water schedule and the FY2026 no-water-rate-increase budget position, 5,000 gallons is approximately $26.15 water ($12.40 + 5×$2.75) plus $27.05 wastewater ($22.55 including the first 4,000 gallons + one additional 1,000-gallon unit at $4.50), or about $53.20 for water and sewer before garbage, roadway, drainage, electric, taxes, or the card-payment fee. At 7,000 gallons, the water/sewer estimate is about $31.65 + $36.05 = $67.70. The published residential sewer maximum is $49.70 per month for metered-water accounts.
Wastewater and sewer calculation
College Station residential sewer is billed from metered water consumption rather than a separate sewer meter. The current published residential charge is $22.55 per month including 4,000 gallons, then $4.50 per additional 1,000 gallons of metered water, with a $49.70 monthly maximum for metered-water residential service. There is no winter averaging in the published description. Customers whose water comes from another provider but are connected to City sewer initially receive the higher published sewer treatment and may submit at least six months of official water bills so Utility Customer Service can evaluate a lower charge for those months and going forward.
Meter reading
Residential College Station water meters are typically 5/8-inch or 3/4-inch and are read monthly by meter readers using handheld computers; the first four meter digits record thousands of gallons and the bill labels each unit MGW. The City's advanced-metering page specifically says its AMI deployment is for electric meters and that water meters are not affected. Accordingly, the current water service is documented as a manual monthly meter-read process, with portal bill/usage access but no published hourly water-transmission interval or water-AMI vendor.
New-account deposit
The current City utility page confirms that deposits are charged to utility accounts, but it does not publish a universal 2026 residential dollar amount or a standard refund timetable. The account holder is responsible for deposits and other charges, and commercial application materials state that all commercial accounts are billed a deposit unless an acceptable letter of credit is submitted; applicants should call Utility Customer Service for the amount. Historic City policy materials described residential deposits based on estimated average monthly utility cost with exemptions for qualifying homeowners or renters enrolled in Auto Pay, but that historical rule is not asserted as the current 2026 residential schedule.
Activation or transfer fee
An Account Creation Fee of $30.90 is required for all accounts and is billed on the first bill. Transfers, new service, and account changes can be requested by phone, mail, fax, online, or in person; the current public page does not publish a separate transfer fee. For new physical construction, the January 1, 2026 fee schedule lists residential water impact fees of $2,325 for a 5/8-inch meter and wastewater impact fees of $3,300, a 5/8-inch water service connection fee of $643.42, and a 4-inch residential sewer connection installation fee of $350; these are development/connection charges, not the ordinary account-creation charge.

Context, not a score

How documentation coverage compares

This profile

100%

overview fields with research notes

Texas

68%

records with any overview detail

National index

50%

records with any overview detail

Coverage measures what this directory documented. It does not measure service quality, affordability, or regulatory compliance.

Research record

Broad public detail found

7 of 7 fields in this section contain provider-specific public detail in dataset August 1, 2026.

Documented

100%

Primary verification routes