Independent directory · evidence, sources, and research gaps shown
US Water Bill PayIndependent U.S. utility directory
← California utility index
Private Investor-Owned UtilityDataset 2026.08PWS ID CA3610041

Fontana Water Company, a San Gabriel Valley Water Company division

Fontana and portions of Rialto, Rancho Cucamonga, and nearby unincorporated San Bernardino County

Population reference

Approximately 237,700 people and roughly 47,000 service connections in the current 2026 SDWIS-derived public system presentation for active PWS CA3610041; the official state annual report previously recorded 228,140 permanent residents and identified the majority of Fontana plus portions of Rialto, Rancho Cucamonga, and San Bernardino County as the service area.

Billing detail

Broad public detail found

Official destination

Open provider website ↗

Provider-specific findings

Billing and account research from public material

Provider-specific research notes are displayed separately from fields that contain only an unavailable-information marker. Read qualifiers in each note and verify current account terms with the provider.

Billing frequency
Monthly, with meters read and billed by geographic cycles. Fontana says it attempts to read all meters within 27–33 days, and its billing instructions describe monthly service charges and consumption units.
Rate structure
CPU​​C-regulated general metered conservation rates with three increasing consumption tiers and a fixed meter service charge. The publicly indexed 2026 tariff material for the 5/8-by-3/4-inch residential meter shows $21.68 per month, $4.5048 per CCF for the first 12 CCF, $5.1580 for the next 12 CCF, and $6.6610 for consumption above 24 CCF, subject to CPUC-approved surcharges and surcredits. Fontana’s regulatory page also links a July 2026 General Rate Case advice letter effective July 20, 2026; the PDF was access-blocked during native review, so customers should confirm the effective tariff with the company or CPUC before treating the indexed figures as the final post-July rate.
Residential cost reference
The company’s official 2026 General Rate Case fact sheet estimates $90.50 per month for a typical 5/8-inch conservation-rate customer using 12 CCF (about 8,977 gallons), up from $79.73, and $74.15 for a qualifying CAP customer. A 5,000–7,000-gallon customer uses about 6.7–9.4 CCF and will generally fall below the 12-CCF example, but the exact bill depends on the effective CPUC tariff, meter charge, CAP status, and applicable 2026 surcharges or surcredits. Fontana Water Company provides potable water only; it does not bill sewer or wastewater service.
Wastewater and sewer calculation
Fontana Water Company provides potable water service only and explicitly states that it does not provide sewer or power services. Therefore, the company does not calculate or collect a wastewater charge relative to clean-water intake, does not use a winter-average sewer formula, and does not apply a flat sewer percentage. Any sewer bill for a customer in Fontana, Rialto, or Rancho Cucamonga comes from the separate municipal or regional wastewater provider serving that parcel.
Meter reading
Fontana reads and bills all meters in geographic cycles every 27–33 days. The company supports both classic mechanical meters and AMR meters: classic meters display cubic-foot totals and ignore the final two black-background digits for billing, while AMR meters display total cubic feet and ignore the final five digits. AMR displays can show a faucet icon for intermittent or continuous leakage during the prior 24 hours. The reviewed materials do not establish full AMI hourly transmission; the defensible description is scheduled monthly-cycle reading with classic and automated meter-reading equipment.
New-account deposit
Fontana requires a customer guarantee deposit under its CPUC rules when credit has not been established; the amount is account-specific rather than a single published residential dollar amount. The company’s guarantee receipt states that the deposit may be applied to unpaid balances, earns interest at 7% per year, and is refundable after the deposit has been held for 12 consecutive months when service remains continuous and bills are paid according to the rules, or upon discontinuance after deducting unpaid water bills. Temporary construction meters require a $1,500 deposit plus an estimated amount based on expected project usage.
Activation or transfer fee
The company says residential or business service applications should be submitted at least 24 hours before the requested start date on a regular business day, with proof of ownership or rental agreement potentially required. The reviewed customer pages do not publish a universal 2026 residential activation or transfer fee; customers should request the application from CustomerService@fontanawater.com and confirm any credit, deposit, field, or transfer charges at (909) 822-2201. Stop-service requests should be made at least two business days in advance.

Context, not a score

How documentation coverage compares

This profile

100%

overview fields with research notes

California

67%

records with any overview detail

National index

50%

records with any overview detail

Coverage measures what this directory documented. It does not measure service quality, affordability, or regulatory compliance.

Research record

Broad public detail found

7 of 7 fields in this section contain provider-specific public detail in dataset August 1, 2026.

Documented

100%

Primary verification routes