Independent directory · evidence, sources, and research gaps shown
US Water Bill PayIndependent U.S. utility directory
← Florida utility index
Municipal DepartmentDataset 2026.08

City of Clearwater Utility Customer Service – Water and Wastewater

City of Clearwater

Population reference

Approximately 117,000 city residents are within Clearwater's municipal service area; the City bills property owners for water, wastewater, stormwater, solid waste, recycling, and related utility services. The published minimum-bill example includes a 5/8-inch meter serving a location inside city limits.

Billing detail

Broad public detail found

Official destination

Open provider website ↗

Provider-specific findings

Billing and account research from public material

Provider-specific research notes are displayed separately from fields that contain only an unavailable-information marker. Read qualifiers in each note and verify current account terms with the provider.

Billing frequency
Monthly utility billing for services rendered. The statement is due upon receipt and becomes past due 21 days from the statement date.
Rate structure
The City uses meter-size and location-specific availability/minimum charges plus measured water and wastewater usage; the public rate page states that a 5/8-inch meter inside city limits receives a minimum bill for zero to four units, with one unit defined as approximately 748 gallons. As of December 2025, the published minimum combined city-limits bill was $130.51 including water $29.58, wastewater $40.74, solid waste $37.27, recycling $3.78, stormwater $16.18, and utility tax $2.96. Rates vary by service package, meter size, location, and consumption, and the City publishes a current fee schedule rather than one universal water-only tier table on the customer page.
Residential cost reference
For a typical 5/8-inch city-limits account at the minimum 0–4-unit usage band, Clearwater's published December 2025 example totals $130.51 for all listed services and utility tax. The water component is $29.58 and wastewater is $40.74; the remaining $60.19 is solid waste, recycling, stormwater, and tax. A water-and-wastewater-only estimate therefore starts at approximately $70.32 before additional consumption, service-specific availability fees, stormwater, solid waste, recycling, and taxes.
Wastewater and sewer calculation
Wastewater is billed as a separate metered utility component and varies with location, meter size, service availability, and consumption. Clearwater's current minimum-bill illustration assigns $40.74 to wastewater for a 5/8-inch city-limits account at zero to four units. If a potable-water leak or unusual use did not enter the City's sewer, the customer may request a sewer credit that can adjust the sewer portion back toward the location's average sewer consumption; the City does not publish a universal winter-average formula on the current customer page.
Meter reading
Clearwater's utility policy identifies radio-read water meters for monitoring water usage. The current public pages do not state a universal monthly read date, transmission interval, or AMI vendor. Bills show a meter reading and usage band, and customers can use the account portal to view bills and balances; for unusually high usage the City directs customers to inspect for leaks and contact Utility Customer Service.
New-account deposit
In general, Clearwater requires a security deposit equal to two times the average monthly bill when utility service is requested. Residential applicants may satisfy the deposit requirement with a referral letter from another utility documenting a good payment record if submitted before service begins. Deposits are applied against the closing account balance and earn annual interest under the City ordinance index. A residential deposit may be refunded after 12 months when the customer has no more than two past-due notices, no nonsufficient-funds checks, and no nonpayment disconnections; deposits may be increased after delinquency.
Activation or transfer fee
The City's current rate page publishes a $50 turn-on fee. New service is requested through the City's utility service-start process and, under City policy, the property owner is the billed party for utility services. The public customer pages do not publish a separate universal transfer/name-change fee; the exact start, stop, connection, deposit, and any service-order charges should be confirmed with Utility Customer Service.

Context, not a score

How documentation coverage compares

This profile

100%

overview fields with research notes

Florida

60%

records with any overview detail

National index

50%

records with any overview detail

Coverage measures what this directory documented. It does not measure service quality, affordability, or regulatory compliance.

Research record

Broad public detail found

7 of 7 fields in this section contain provider-specific public detail in dataset August 1, 2026.

Documented

100%

Primary verification routes