Independent directory · evidence, sources, and research gaps shown
US Water Bill PayIndependent U.S. utility directory
← Texas utility index
Public Water AuthorityDataset 2026.08

New Braunfels Utilities (NBU) Water and Wastewater Services

New Braunfels and the NBU water/wastewater service area in Comal, Guadalupe, and surrounding regional communities

Population reference

More than 70,000 electric, water, and wastewater customers; NBU is a nonprofit, community-owned utility serving New Braunfels and its regional service area.

Billing detail

Broad public detail found

Official destination

Open provider website ↗

Provider-specific findings

Billing and account research from public material

Provider-specific research notes are displayed separately from fields that contain only an unavailable-information marker. Read qualifiers in each note and verify current account terms with the provider.

Billing frequency
Monthly. NBU's ordinance requires service consumption to be determined and billed no less frequently than monthly; bills can reflect actual, averaged, estimated, or annualized service under the Service Conditions Policy.
Rate structure
Increasing tiered residential usage rates with a fixed 5/8-inch base, a water-supply fee on higher tiers, landscape/irrigation rates, and drought-stage surcharges. FY2026 projected residential water rates list a $17.64 base, $2.36 per 1,000 gallons for 0-3,000, $5.71 for 3,001-6,000, $8.79 for 6,001-12,000, and $13.46 over 12,000, with a $2.43 per-1,000 water-supply fee in tiers 3 and 4. NBU's rate calculator identifies essential use as up to 6,000 gallons without irrigation; Stage III and Stage IV drought surcharges apply above defined thresholds.
Residential cost reference
NBU's published average profile uses up to 6,000 gallons of residential water and 4,600 gallons of wastewater. Using FY2026 projected rates, a 5/8-inch account at 5,000 gallons is approximately $17.64 base plus tiered water usage (about $20-$25 depending on the exact tier interpretation and supply-fee treatment), plus wastewater availability of $36.19 and about $8.51 per 1,000 gallons for a 4,600-gallon average, or roughly $95-$105 for water and wastewater before electric, City garbage/recycling, and other charges. A 7,000-gallon month is higher because it enters the 6,001-12,000 water tier; wastewater remains based on the rolling average and is capped at $194.44 for Residential 1.
Wastewater and sewer calculation
For NBU Residential 1, FY2026 wastewater has a $36.19 monthly service-availability charge, $8.51 per 1,000 gallons, and a $194.44 maximum monthly charge. The customer's wastewater volume is calculated from the three lowest months of water use in the preceding rolling 12-month period; NBU's rate calculator says the average customer is 4,600 gallons. Customers without a full usage history can be handled under NBU's service rules. Residential wastewater-only service is separately priced at $103.03, and multifamily/general-service classes use different availability, unit, and volume charges.
Meter reading
NBU implemented Advanced Metering Infrastructure meters for the electric and water systems beginning in 2016. NBU's Dynamic Customer Information and current tools expose consumption data, usage reports, and rapid leak awareness; the utility's rate calculator uses rolling 12-month water history for wastewater averaging. The public pages do not identify the current meter manufacturer or guarantee an hourly transmission interval, but NBU's AMI system supports remote readings and customer usage insight.
New-account deposit
NBU requires a security deposit whose amount varies by account history and service type. A soft credit check may waive a residential deposit without affecting the customer's credit score. Customers must provide a completed application, valid photo identification, and any required deposit; the public pages do not publish a universal residential dollar amount or refund timeline. Fire-hydrant/temporary meters separately require a $300 deposit under the current water-service ordinance.
Activation or transfer fee
Start, stop, and transfer requests must be submitted at least one business day before the requested date; requests after business hours are processed within one to two NBU business days and requested dates are not guaranteed. The current public pages do not state a universal residential activation or transfer fee, while a security deposit may apply. NBU's rate/service materials separately govern new meter, construction, and temporary-meter charges.

Context, not a score

How documentation coverage compares

This profile

100%

overview fields with research notes

Texas

68%

records with any overview detail

National index

50%

records with any overview detail

Coverage measures what this directory documented. It does not measure service quality, affordability, or regulatory compliance.

Research record

Broad public detail found

7 of 7 fields in this section contain provider-specific public detail in dataset August 1, 2026.

Documented

100%

Primary verification routes